The entrance from the addition into the old building (right) preserved
the limestone archway. The entrance from the new lobby intro the
new addition offices (left) is made of oak stained to match the
existing building.
|
|
The new central entrance provided a point of transition between
the old and new. The 2-1/2 story glass entrance includes a 1-1/2
story lobby. The new entrance is made grand with the used of 2 GFRC
columns. The 1st floor of the addition is actually the basement
of the existing building. Due to the topography of the site on the
courthouse square, the new addition use able to have the 1st floor
at grade, which made ADA access to both buildings. The relocation
of the clerk on the third floor was to have more access to the court.
The existing courtroom entrance (top middle) was preserved, but
a metal detector was added to the operable door.
|